What pile driver is used for CFG piles? Analysis of hot topics and hot content across the entire network
Recently, the construction technology and equipment selection of CFG piles (cement fly ash gravel piles) have become a hot topic in the engineering field. This article will combine the hot content of the entire network in the past 10 days to conduct a structured analysis of pile driver types, applicable scenarios and technical comparisons commonly used in CFG pile construction to help readers quickly grasp the core information.
1. Commonly used pile driver types in CFG pile construction

| Pile driver type | Working principle | Applicable geological conditions | Efficiency comparison |
|---|---|---|---|
| Long auger drilling rig | Rotary drilling to form holes and pumping concrete to form piles | Clay, silt, sand layer | High (average 30-50 strands per day) |
| Vibration immersed pipe pile driver | High frequency vibration immersed tube, poured concrete tube extrusion | Soft soil, backfill soil layer | Medium (average 20-30 sticks per day) |
| Rotary drilling rig | Rotate the soil to form a hole, and then pour concrete | Hard soil layer, pebble layer | Low (average 15-25 sticks per day) |
2. Focus on hot issues across the network
1.Equipment selection disputes: In a recent engineering project, the use of a vibrating immersed pile driver resulted in pile necking, triggering a discussion on the superiority of long auger drills. Experts recommend giving priority to long auger drills in soft soil areas.
2.Technological innovation trends: A company in Shandong has launched a new CFG pile driver with an intelligent control system, which can monitor drilling pressure and concrete flow in real time. The construction efficiency has been increased by 20%, which has become the focus of the industry.
3.Impact of environmental policies: The Beijing-Tianjin-Hebei region recently issued new emission regulations for construction machinery. Diesel-powered pile drivers need to be equipped with exhaust gas treatment devices. Searches for electric pile drivers increased by 45% year-on-year.
3. Comparison of key indicators for pile driver selection
| index | Long auger drilling rig | Vibration immersed pipe pile driver | Rotary drilling rig |
|---|---|---|---|
| Single pile cost (yuan) | 800-1200 | 600-900 | 1500-2000 |
| Maximum pile length (m) | 28 | 20 | 35 |
| Noise level (dB) | 75-85 | 90-100 | 70-80 |
| Site requirements (㎡) | 6×15 | 5×12 | 8×20 |
4. Industry Trend Forecast in 2024
1.Electric transformation: According to industry reports, the market share of electric pile drivers is expected to increase from 18% in 2023 to 35% in 2025, mainly due to government subsidies and energy cost advantages.
2.Intelligent upgrade: A remote monitoring system equipped with a 5G module will become standard and can realize functions such as automatic correction of pile verticality and real-time early warning of concrete filling coefficient.
3.Composite process development: Recently, a project in Guangzhou tried the "long spiral + high-pressure grouting" combination process, which increased the pile bearing capacity by 30%. The number of clicks on this technical solution on professional forums increased by 120% every week.
5. Construction case reference
| Project name | geological conditions | Choose pile driver | Number of piles completed | Qualification rate |
|---|---|---|---|---|
| A residential project in Zhengzhou | silty clay | Long auger drilling rig | 1200 pieces | 98.7% |
| Hangzhou subway supporting project | Silty soil | Vibration immersed pipe pile driver | 860 roots | 95.2% |
| Chengdu commercial complex | Sand and pebble layer | Rotary drilling rig | 650 pieces | 97.1% |
Conclusion: The selection of CFG pile driver requires comprehensive consideration of multiple factors such as geological conditions, construction period requirements, and environmental protection standards. It is recommended that construction units refer to the latest industry data and conduct construction simulations combined with BIM technology to optimize equipment selection plans. With the development of intelligent construction technology, CFG pile construction will present more efficient and precise technical features in the future.